Please watch an introduction to the major features of Smart Welding Manager, a cloud-based weld mapping, weld tracking, fabrication and welding management software with companion mobile apps.
This post is about how a contractor for Saudi Aramco projects can effectively use Smart Welding Manager to fulfil all the requirements of SAEP-1160. SAEP-1160 is a Saudi Aramco Engineering Procedure (SAEP) for Tracking And Reporting of Welding, NDT And Pressure Testing For Capital Projects. This document establishes minimum requirements and responsibilities for the tracking and reporting of production welding, welder performance, NDE tracking and pressure test verification associated with construction activities at Saudi Aramco facilities. Clause 6.1 of this procedure requires: Contractor to make sure that data management and tracking systems shall have all relevant information to ensure material...